Water Special Facilities Works - Yanbu

Location Yanbu

Type EPC

Sector Water

Status Completed

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

constructing four 170,000 m³ desalinated-water storage tanks (each 106 m deep), a new pumping station with PS Rayis and PS1-D extensions, and an 84-inch (~39.5 km) transmission pipeline. This integrated system ensures a reliable, high-capacity water supply to support Yanbu’s growing industrial and residential needs.

pro-btm

Related Projects

project-1

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

NEOM

EPC

Completed

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

project-1

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

NEOM

EPC

Completed

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

project-1

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

Khobar / Hofuf

EPC

Completed

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

project-1

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

Waad Al-Shamal

EPC

Completed

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

project-1

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

Riyadh

EPC

Completed

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.