Water Transmission System - Gayal
Location NEOM
Type EPC
Sector Water
Status Ongoing
MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.
The scope also included three 5 ML back-pressure tanks, two 0.1 ML break-pressure tanks, and a 1 ML reservoir, creating a resilient network that secures the national giga project's critical water supply.