Water Transmission System - AlBada'a
Location NEOM
Type EPC
Sector Water
Status Ongoing
MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.
We also delivered back-pressure tanks (5 ML and 0.1 ML) and a 1 ML reservoir, creating a fully integrated system that reliably transports and stores vital water supplies across the national giga project's developments.