Wadi Al-Sulay Flood Management (Phase III)

Location Riyadh

Type EPC

Sector Water

Status Ongoing

Implementation of rainwater and flood drainage channels and networks

opening and refining the Wadi Al-Sulay channel, digging flood channels, implementing ponds and lining them with stone whitewash, lining the valley with stonework, and leveling the roads.

pro-btm

Related Projects

project-1

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

Riyadh

EPC

Ongoing

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

project-1

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

Waad Al-Shamal

EPC

Ongoing

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

project-1

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

Khobar / Hofuf

EPC

Ongoing

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

project-1

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

NEOM

EPC

Ongoing

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

project-1

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

NEOM

EPC

Ongoing

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.