Salboukh Strategic Water Reservoir
 (1.0 million m3)

Location Riyadh

Type EPC

Sector Water

Status Completed

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

The EPC scope included a chlorination station, operations & control building with pump house, guard and electrical rooms, administration block, and a dedicated Saudi Electricity Company (SCECO) building, creating a fully integrated water storage and treatment hub for the capital.

pro-btm

Related Projects

project-1

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

Jubail / Buraydah

EPC

Completed

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

project-1

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

Makkah

EPC

Completed

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

project-1

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

Abha

EPC

Completed

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

project-1

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

Riyadh

EPC

Completed

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

project-1

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

Yanbu

EPC

Completed

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4