Replacement of Technologies
- Jubail Desalination SWRO Plant

Location Jubail / Buraydah

Type EPC

Sector Water

Status Ongoing

MGC is executing a full-scale renewal of the Jubail seawater reverse osmosis (SWRO) facility to restore and modernize its 600,000 m³/day capacity.

The EPC scope covers end-to-end works—from seawater intake and marine works through pretreatment, RO trains and post-treatment, to network tie-in and effluent discharge—plus all civil, mechanical, electrical and auxiliary systems. By replacing aging assets with modern, reliable technology and completing comprehensive on-site installations, the project secures long-term operational performance, improves plant resilience, and ensures uninterrupted potable-water supply for Jubail’s industrial and municipal needs.

pro-btm

Related Projects

project-1

Al-Mughammas Reservoir Transmission Systems (MRTS – Package B)

MGC established 155 km of carbon steel transmission mains of varying diameters to link and extend the city’s dip tanks and distribution groups.

Makkah

EPC

Ongoing

Al-Mughammas Reservoir Transmission Systems (MRTS – Package B)

MGC established 155 km of carbon steel transmission mains of varying diameters to link and extend the city’s dip tanks and distribution groups.

project-1

Qassim–Hail Road Intersection & Connection Improvements

MGC enhanced key surface intersections and connection areas across the Qassim and Hail regions

Qassim / Hail

EPC

Ongoing

Qassim–Hail Road Intersection & Connection Improvements

MGC enhanced key surface intersections and connection areas across the Qassim and Hail regions

project-1

Northern Riyadh Road Network Maintenance

In Riyadh’s northern sector, MGC performed comprehensive curative and preventive maintenance to enhance road quality, safety, and traffic flow.

Riyadh

EPC

Ongoing

Northern Riyadh Road Network Maintenance

In Riyadh’s northern sector, MGC performed comprehensive curative and preventive maintenance to enhance road quality, safety, and traffic flow.

project-1

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

Riyadh

EPC

Ongoing

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

project-1

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

Yanbu

EPC

Ongoing

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4