Northern Riyadh Road Network Maintenance

Location Riyadh

Type O&M

Sector Transport

Status Ongoing

In Riyadh’s northern sector, MGC performed comprehensive curative and preventive maintenance to enhance road quality, safety, and traffic flow.

Works included asphalt resurfacing, road-marking repainting, soil stabilization, sidewalk repairs, and the installation of upgraded safety signage, ensuring a smoother, safer urban network for commuters.

pro-btm

Related Projects

project-1

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

Jubail / Buraydah

O&M

Ongoing

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

project-1

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

Makkah

O&M

Ongoing

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

project-1

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

Abha

O&M

Ongoing

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

project-1

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

Riyadh

O&M

Ongoing

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

project-1

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

Waad Al-Shamal

O&M

Ongoing

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.