Khobar–Hofuf Water Transmission System Phase II

Location Khobar / Hofuf

Type EPC

Sector Water

Status Completed

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

constructed the Khobar Pump Station and Abqaiq and Oyoun tie-in stations, and delivered the Hofuf Terminal Station, fully equipped and including two 170,000 m³ storage tanks, to secure the Eastern Province’s potable water network.

pro-btm

Related Projects

project-1

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

Riyadh

EPC

Completed

Salboukh Strategic Water Reservoir (1.0 million m3)

MGC delivered six interconnected 1 million m³ strategic reservoirs at Salboukh, complete with 1 400 mm and 1 200 mm carbon steel transmission mains.

project-1

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

NEOM

EPC

Completed

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

project-1

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

NEOM

EPC

Completed

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

project-1

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

Yanbu

EPC

Completed

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

project-1

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.

Waad Al-Shamal

EPC

Completed

King Abdullah Phase II Treated Sewage Effluent Water Transmission System - Waad Al-Shamal

MGC supplied and installed 140.8 km of 1,200 mm-diameter glass-reinforced plastic (GRP) pipeline and 55.2 km of 1,400 mm GRP pipeline.