Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

Location Jubail / Buraydah

Type EPC

Sector Water

Status Ongoing

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.


Our delivery included two 650,000 m³/d pumping stations (PS1 & PS2) interconnected with the Jubail Water Special Facility, alongside the Buraydah reservoir and tie-in stations. We also developed three new support facilities: Rafiah Reservoir Station, Asiaah Reservoir Station, and Asiaah Tanker Filling Station, creating a resilient, large-scale water transmission system that bridges the Eastern Province to Qassim.

pro-btm

Related Projects

project-1

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

Jubail / Buraydah

EPC

Ongoing

Jubail–Buraydah Independent Water
Transmission Pipeline (IWTP)

MGC engineered and installed a 582-kilometer mainline (DN 2500, 2400, 2300 mm) from Jubail to Buraydah, complete with future-ready tap-offs for seamless network expansion.

project-1

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

Makkah

EPC

Ongoing

Al-Ma’asem Reservoir Expansion Project

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

project-1

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

Abha

EPC

Ongoing

Abha Water Transmission System

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

project-1

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

Riyadh

EPC

Ongoing

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

project-1

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

Yanbu

EPC

Ongoing

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4