Al-Mughammas Reservoir Transmission Systems (MRTS – Package B)
Location Makkah
Type EPC
Sector Water
Status Completed
MGC established 155 km of carbon steel transmission mains of varying diameters to link and extend the city’s dip tanks and distribution groups.
This EPC scope delivered a robust pipeline network that efficiently transports reservoir water across Makkah, bolstering the region’s supply resilience.