Al-Ma’asem Reservoir Expansion Project

Location Makkah

Type EPC

Sector Water

Status Completed

MGC demolished the existing 90,000 m³ steel tank and delivered a new 190,000 m³ steel reservoir

more than doubling storage to secure Makkah’s water supply and support the city’s growing needs.

pro-btm

Related Projects

project-1

Al-Mughammas Reservoir Transmission Systems (MRTS – Package B)

MGC established 155 km of carbon steel transmission mains of varying diameters to link and extend the city’s dip tanks and distribution groups.

Makkah

EPC

Completed

Al-Mughammas Reservoir Transmission Systems (MRTS – Package B)

MGC established 155 km of carbon steel transmission mains of varying diameters to link and extend the city’s dip tanks and distribution groups.

project-1

Qassim–Hail Road Intersection & Connection Improvements

MGC enhanced key surface intersections and connection areas across the Qassim and Hail regions

Qassim / Hail

EPC

Completed

Qassim–Hail Road Intersection & Connection Improvements

MGC enhanced key surface intersections and connection areas across the Qassim and Hail regions

project-1

Northern Riyadh Road Network Maintenance

In Riyadh’s northern sector, MGC performed comprehensive curative and preventive maintenance to enhance road quality, safety, and traffic flow.

Riyadh

EPC

Completed

Northern Riyadh Road Network Maintenance

In Riyadh’s northern sector, MGC performed comprehensive curative and preventive maintenance to enhance road quality, safety, and traffic flow.

project-1

Taif - Al Baha Roads Maintenance Contract No. (302)

Implementation of road maintenance works

Taif / Al Baha

EPC

Completed

Taif - Al Baha Roads Maintenance Contract No. (302)

Implementation of road maintenance works

project-1

Al-Kharj Desalination Water Transmission Project

MGC supplied and installed over 151 km of ductile-iron pipeline, 51,800 m of PN40 (Ø1100 mm) and 99,570 m of PN25 (Ø1200 mm),

Al-Kharj

EPC

Completed

Al-Kharj Desalination Water Transmission Project

MGC supplied and installed over 151 km of ductile-iron pipeline, 51,800 m of PN40 (Ø1100 mm) and 99,570 m of PN25 (Ø1200 mm),