Abha Water Transmission System

Location Abha

Type EPC

Sector Water

Status Completed

MGC supplied and installed a 58,000-meter carbon steel pipeline (DN 56″ & DN 36″)

complete with protective coating and lining, and constructed a high-capacity pumping station to ensure reliable water delivery and optimal pressure across the Abha network.

pro-btm

Related Projects

project-1

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

NEOM

EPC

Completed

Water Transmission System - AlBada'a

MGC engineered and installed an 82 km DN1000 carbon steel pipeline and a 25 km DN150 pipeline, both rated for 96 MLD, supported by two 96 MLD pumping stations at Lower Mountain and two 1 MLD stations at the Visitor Center.

project-1

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

NEOM

EPC

Completed

Water Transmission System - Gayal

MGC installed a 45 km DN1000 carbon steel pipeline rated at 95 MLD and delivered three 95 MLD Lower Mountain pump stations alongside two 1 MLD Visitor Center stations.

project-1

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

Yanbu

EPC

Completed

Water Special Facilities Works - Yanbu

MGC delivered a comprehensive special-facilities package in Yanbu’s Phase 4

project-1

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

Riyadh

EPC

Completed

Wadi Al-Sulay Flood Management (Phase III)

Implementation of rainwater and flood drainage channels and networks

project-1

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,

Khobar / Hofuf

EPC

Completed

Khobar–Hofuf Water Transmission System
Phase II

MGC supplied and installed 135.3 km of 80″-diameter and 18.3 km of 24″-diameter carbon steel pipeline,